Clinic room flooring and finishes
Floor preparation, leveling and interior finishing in a clinic room and adjacent area.
These larger projects were completed by Aleksei and his team while working for licensed construction companies. KST Handyman today is me on my own, doing small jobs.
5 photographs

What was done
I led this project as foreman and worked hands-on with the team under a licensed construction company.
Our work included removing the old flooring, applying ARDEX K 15 self-leveling underlayment, laser-controlled leveling and grinding. We skim-coated the walls, reinstalled the door and replaced LVP flooring in the adjacent area.
I checked the leveling with a laser and achieved a tolerance of 1/16 inch over 16 feet on this project.
Every photograph
All projectsSomething smaller to fix?
Send a photo of it. You get a written price back before anything is touched.



